Running Kiran Productions
A connected operating system for sales, promotion, PR, crew operations, project management, and post-production — built around the studio's actual scale (200+ weddings a year), its existing pricing and award history, and the tools already in hand.
Every wedding moves through the same lifecycle, and each stage has one clear owner and one system of record — this is what replaces tracking things across dozens of separate WhatsApp threads.
| Stage | Owner | Primary system |
|---|---|---|
| Lead comes in (referral, Instagram, Meta ad, website, wedding directory) | Sales / Inquiry team | Jotform → CRM |
| Qualify + consultation | Sales / Inquiry team | CRM |
| Quotation sent + follow-up | Sales / Inquiry team | CRM |
| Contract signed + deposit paid | Sales / Inquiry team | CRM |
| Job created, crew assigned | Operations Manager | Project Management board |
| Shoot day | Crew lead | Google Calendar + shoot-day checklist |
| Footage ingested + backed up | Operations Manager / Crew lead | Google Drive |
| Editing assigned + produced | Post-Production Manager + Editors | Project Management board + Drive |
| Quality control + client review | Post-Production Manager | Project Management board |
| Final delivery | Post-Production Manager / Customer care | CRM gallery delivery |
| Testimonial + case study capture | Marketing / PR | CRM + press kit |
| Content, PR, referral loop back to Sales | Marketing / PR | Canva + Meta Ads |
Sales & Booking
This is where a wedding stops being an inquiry and becomes a booked job with a signed contract and a deposit in hand. Wedding couples are typically comparing 3–5 studios in a short window, so speed and consistency here drive conversion directly.
1.1Pipeline stages
| Stage | Target turnaround | What happens |
|---|---|---|
| New inquiry | Within 2 hours | Captured via Jotform / Instagram DM / call, logged in the CRM immediately |
| Qualify | Same day | Confirm date availability, budget range, and package fit before booking a consultation |
| Consultation | 2–3 days after inquiry | Call or in-person meeting; understand vision, events to cover, guest count |
| Quotation sent | 24–48 hours after consult | Package quote in the studio's standard format (1.3) |
| Follow-up cadence | Day 1, 3, 7, 14 | Structured follow-up — most bookings close on a follow-up, not the first quote |
| Contract + deposit | Within 7 days of verbal yes | E-signed contract + booking deposit before the date is held as confirmed |
| Handoff to Operations | Within 24 hours of deposit | Job created on the Project Management board (Section 5) |
1.2Current package tiers (Bangalore / Mangalore)
The three tiers aren't just different quantities of deliverables — each represents a different standard of creative treatment, storytelling, and overall experience. Classic is the essential level of the studio's service; Signature is a premium level of execution; Celebrant is the studio's highest tier, a next-level luxury creative experience. Even if Classic is eventually retired, this creative-level architecture (Essential / Premium / Luxury) should stay part of the internal workflow — it's what post-production is built around (see 6.2).
| Package | Creative level | Includes | Price |
|---|---|---|---|
| Classic | Essential | 800 edited photos, 2 Elegant albums (add-on), Wedding Film + Insta Reel | ₹2,00,000 |
| Signature | Premium | 1,200 edited photos, 2 Elegant albums (add-on), Wedding Film + Insta Reel + Documentary Movie | ₹2,50,000 |
| Celebrant | Luxury | TBD — to be defined | TBD |
Component pricing for custom quotes: 1 artist (crew member) = ₹20,000 · Elegant album = ₹25,000 · Photonovelet album = ₹35,000. Albums stay listed as an add-on on the comparison table, not repeated per package.
Celebrant's deliverables and price still need to be defined — the row above is a placeholder so the three-tier structure is visible everywhere ahead of that decision.
1.3Quotation format — the "Ninja pattern"
- Classic listed first as Package One, Signature second as Package Two, Celebrant third as Package Three once its deliverables and price are finalized
- Each event shown with coverage timings alongside date and location
- Photo delivery phrased as "delivered within X days (after photo selection from client)"
- A named reel per major event (e.g. "Roce Reel") in addition to the Couple Reel
- Side-by-side package comparison table before the closing page
- Gold cluster emblem watermark (8% opacity, centered) on interior pages only — never cover or closing page
- Closing page: clickable website, Instagram, and YouTube links with icon glyphs
1.4Tooling in place
| Tool | Role |
|---|---|
| Studio Ninja + in-house CRM in use | Already the system of record for quoting, contracts, and booking — the pipeline stages in 1.1 map onto these tools, not a new platform. No CRM change needed. |
| Jotform available | Inquiry form on the website and Instagram bio, feeding straight into Studio Ninja instead of arriving as a bare WhatsApp message with no record. |
1.5Sales KPIs to track weekly
- Inquiry volume, by channel
- Response time (target: under 2 hours during business hours)
- Quote-to-booking conversion rate
- Average booking value
- Pipeline value of open, not-yet-booked leads
Promotion & Marketing
Promotion keeps the top of the sales funnel full — consistent, on-brand content plus paid reach where it's most efficient, not sporadic posting.
2.1Channels
| Channel | Role | Status |
|---|---|---|
| Instagram (organic) | Primary portfolio + discovery — reels, behind-the-scenes, testimonials | needs calendar |
| Meta Ads | Paid reach for inquiries, retargeting website/profile visitors | connected |
| YouTube | Full wedding films and documentary content — long-form proof of quality | active |
| Website (kiranproductions.in) | Portfolio + inquiry form + SEO landing pages by city | add Jotform |
| Wedding directories (WeddingSutra, etc.) | High-intent traffic already comparing studios | active |
| Referral program | Past clients + allied vendors | formalize |
2.2Content engine
- Build social assets in Canva using the brand kit — deep maroon, gold, cream, near-black — so every post is instantly recognizable
- Target cadence: 4–5 posts/week — reels from recent weddings, behind-the-scenes, testimonials, award announcements
- Every delivered wedding is a content source — pull 1 reel + 3–5 static posts from each, on rotation, so content never runs dry in a slow booking month
- Batch-create a week or two of content at once in Canva rather than designing post-by-post
2.3Referral program
- Past-client referrals: a thank-you gift or credit toward future services (e.g. an anniversary shoot) for a referral that books
- Vendor referrals: a standing relationship with 5–10 wedding planners, venues, and makeup artists per city — tracked as their own contacts in the CRM
2.4Meta Ads approach
- City-specific campaigns (Bangalore, Mangalore) targeting recently-engaged audiences and wedding-related interests
- Retarget website and Instagram profile visitors who haven't inquired yet
- Feature award-winning work as ad creative — proof performs better than generic portfolio shots
- Review cost-per-lead monthly; shift budget toward whichever city/campaign converts best
2.5Promotion KPIs
- Reach and engagement rate by channel
- Cost per lead (Meta Ads)
- Inquiry volume attributable to each channel
PR & Reputation
Kiran Productions already has a strong award record — this is a real asset that should be run as a system, not treated as a one-off when an award happens to arrive.
3.1Awards calendar
| Award | Track record |
|---|---|
| WOW Awards Asia | Gold / Silver / Bronze across multiple categories, 2025 & 2026 — submit annually |
| ET Achievers Karnataka (The Times Group) | Won 2023, Innovative Wedding Photography and Filming |
| GIWA | Won 2024, Best Wedding Moments (Still) |
| WeddingSutra Photography Awards | Runner-up/Winner, Kids & Couple Portraits, 2023–2025 |
| Users' Choice Awards | Winner, Best in Mangalore Photographers, 2023 & 2024 |
3.2Press & feature outreach
- Maintain relationships with outlets already covering the studio's work (EventFAQs, WeddingSutra) — pitch standout weddings as features, not just award entries
- Keep an updated press kit: logo files, award list, notable weddings, studio bio, contact — ready to send on request
3.3Testimonial & case study pipeline
- Request a review within 2 weeks of final delivery, while the experience is fresh
- Turn the strongest 1–2 weddings a month into full case studies — used across Instagram, the website, and award submissions
- Route 5-star reviews to Google/wedding directories; route critical feedback privately to the Post-Production and Operations Managers, not just noted and forgotten
3.4PR KPIs
- Awards submitted vs. won, per cycle
- Press features secured
- Testimonial capture rate (% of delivered weddings with a review on file)
Crew Operations
Getting the right people, with the right gear, to the right wedding, on time and prepared.
4.1Roster & roles
- Lead Photographer/Videographer — owns the shoot creatively and technically; final call on coverage priorities
- Second shooter/assistant — additional angles, candids, backup
- Freelancer pool — flexed up in peak season; vet 10–15 reliable freelancers per city ahead of time, don't scramble last-minute
4.2Pre-shoot preparation
- Shot list and family/group photo list confirmed with the couple at least 1 week ahead
- Event timeline shared with the full crew 48 hours ahead
- Equipment checklist run and signed off by the crew lead the night before (bodies, lenses, charged batteries, formatted cards, backup gear)
- Crew assignments and call times locked in Google Calendar, not a WhatsApp message that scrolls away
4.3Shoot-day workflow
- Crew lead is the single point of coordination on the day — client questions route through them
- Backup gear carried for every critical item — no single point of failure
- Footage backed up to two locations the same day, before cards are reused
- Crew lead confirms with the Operations Manager same-day that footage is safely backed up — this is what moves the job to "Footage ingested" on the Project Management board
4.4Crew communication
Replace one open-ended WhatsApp group per wedding with a structured shoot-day brief (on the PM board or a shared doc) plus a time-boxed WhatsApp group that's archived once the job is delivered — so nothing important is buried in a live thread months later.
4.5The Wedding Story Catalog
Every element of a wedding is part of its story: the couple, the family, the venue, décor, flowers, dress, jewellery, food, rituals, performances, guests, emotions, traditions, and small personalized details. The crew lead is best placed to capture this while it's fresh — not the editor, weeks later, staring at raw footage with no context.
- Alongside the shot list (4.2), the crew lead builds a short Wedding Story Catalog during and immediately after the shoot: what mattered about this couple and this day, key emotional beats, any personalized details worth foregrounding
- This travels with the footage as part of the handoff to Post-Production — it's the raw material for the Creative Brief editors work from (6.4), not a substitute for it
- Most important for Signature and Celebrant projects, where creative interpretation and storytelling are central to what the client is paying for — a Classic job can run on a lighter version of this
4.6Crew Ops KPIs
- On-time crew arrival rate
- Equipment-issue incidents per quarter
- Same-day footage backup completion rate
- Wedding Story Catalog completion rate — % of jobs filled in before handoff to Post-Production
Project Management
The spine of the whole system — the single place every wedding's status lives, replacing the scattered per-client WhatsApp tracking. This is the primary responsibility of the Operations Manager/Coordinator.
5.1The job board
One board, one card per wedding, moving through fixed stages:
Booked → Pre-shoot prep → Shoot completed → After-shoot payment pending → After-shoot payment completed → Footage ingested → Editing assigned → Draft ready → Client review → Revisions → Final approved → Delivered → Archived
The after-shoot payment stages are a deliberate gate, not just bookkeeping: no job should move into active editing while payment is still pending. As of this update, "After-shoot payment completed" is also the trigger for the 60-day delivery clock itself (6.6) — the two are no longer separate, since starting the clock any earlier would make post-production accountable for a delay the payment process caused.
Each card carries: couple name, wedding date, package (and creative level — Classic/Signature/Celebrant, see 1.2), assigned crew, assigned editor(s), delivery deadline, and current status — visible to everyone who needs it, without asking.
5.2Recommended tooling
| Tool | Why |
|---|---|
| ClickUp | Kanban board with custom fields (crew, editor, deadline), automations for stage changes, mobile access for an often-on-site team. Free tier works for a small team; paid tiers run roughly $7–12/user/month — confirm current pricing. |
| Alternative: monday.com | Comparable capability and pricing, strong visual status views. |
| Alternative: Trello | Lighter and low/no-cost to start before committing to a full platform — less powerful for automations and reporting at 200+ jobs/year. |
5.3Cadence
- Weekly ops review (Section 9): walk every active card, flag anything at risk of missing its delivery date
- Anything untouched for more than 5 days at a stage gets flagged automatically rather than discovered late
5.4Daily, weekly, and project-level control
As volume grows, the board can't run on memory or informal follow-ups — every active job needs to be trackable at three levels simultaneously:
| Level | Question it answers |
|---|---|
| Daily | What needs to be worked on today? |
| Weekly | What must be completed and closed this week? |
| Project | Where does this wedding stand relative to its delivery deadline? |
Every active card must always show four things: Current Stage, Responsible Person, Next Action, and Due Date. No card should ever sit without a clear owner or a clear next step — that's the single rule that keeps the board honest as job count grows.
5.5Project Management KPIs
- On-time delivery rate
- Average cycle time, booking to final delivery
- Jobs flagged "at risk" per week, and how quickly they're resolved
- Cards with a missing owner or missing next action — should be zero at any given time
Post-Production Management
This is the studio's real bottleneck right now, not a hypothetical one — deliveries are running 90+ days past target. But the objective here isn't simply to finish projects within 60 days. It's a Post-Production environment where the right project reaches the right creative person, at the right time, with the right brief, follows the right workflow, receives the right level of quality control, and is delivered within the committed timeline. Five things connect for that to work: Package (Classic/Signature/Celebrant), Creative Level (Essential/Premium/Luxury), People (Coordinator/Editor/Designer/Colourist/Creative Head/QC), Process (Brief → Assignment → Production → QC → Corrections → Delivery), and Control (daily tracking, weekly closure, the 60-day countdown, notifications, escalation).
6.1Why deliveries are running months late
With roughly 65–75% of ~200 weddings landing in a 4-month window (Nov–Feb), peak-season intake is somewhere around 30–35 weddings a month — two to three times the off-peak rate. If the team's editing throughput doesn't scale with that spike, the queue grows every peak season faster than it can be cleared, and the backlog compounds year over year. That's the most likely mechanical cause of a 90+ day delay, independent of any one editor's individual speed — it's a capacity problem before it's a performance problem. The Capacity Planner above turns this from a suspicion into a number.
6.2Creative levels: making the difference visible
Classic, Signature, and Celebrant (1.2) are not pricing tiers that happen to include different quantities of footage or editing hours. Each represents a different standard of creative treatment, storytelling, and execution — and the post-production system has to make sure that difference actually shows up in the final output, not just on the invoice.
A Celebrant film should not simply contain more footage or more editing hours than a Classic one. It should demonstrate better creative thinking, stronger storytelling, refined visual treatment, sophisticated music selection, emotional pacing, colour, sound, and finishing. Concretely: Celebrant and Signature jobs default to the studio's most senior creative talent (6.3, 6.5), get the fuller Wedding Story Catalog / Creative Brief treatment (6.4), and are held to the tightest QC standard (6.12) — while Classic runs on a leaner version of the same process, not a different one.
6.3Editor tracks
Post-production doesn't run through one undifferentiated pool of "editors" — distinct tracks and specialist roles handle different deliverables, at different speeds, and should be staffed and tracked separately rather than lumped into a single headcount number:
| Track / role | What it produces | Notes |
|---|---|---|
| Photo Editors | Culled, edited, and retouched photo gallery/album | Highest volume, most standardized work — the best candidate for tight per-photo throughput targets. |
| Designer | Final album layout and print files | Often the same person as a Photo Editor on Classic jobs; on Signature/Celebrant, a dedicated Designer gives the album the attention its price point implies. |
| Creative Editors | Wedding film, reel, and teaser | The most creative, highest-skill work. Lead Editors within this track review cuts and own first-pass QC; the Chief Editor / Creative Head is the most senior creative voice and final sign-off on flagship (Celebrant) deliverables. |
| Colourist | Colour grading pass on creative deliverables | On Classic/Signature this is usually folded into the Creative Editor's own pass; a dedicated Colourist becomes worthwhile once Celebrant volume justifies a specialist. |
| Documentation Editors | Full-length edit of the entire event | Less creative per hour than the highlight film, but the longest single task — assembling the complete raw footage of the day is what drives its editor-days, not creative complexity. |
Each track has its own throughput, so a single blended "editor-days per wedding" number hides more than it reveals. The Capacity Planner models Photo, Creative, and Documentation as three separate tracks (Designer and Colourist load folds into Photo and Creative respectively until volume justifies breaking them out) — plug in real headcount and editor-days for each to see which one is actually the constraint.
6.4The Wedding Story Catalog & Creative Brief
The editor should never simply receive a folder of footage and be asked to "make a highlight." They should know what the story of this wedding actually is. The Wedding Story Catalog captured by the crew lead during the shoot (4.5) is the raw material; Post-Production turns it into a short Creative Brief attached to the job before assignment — the couple's story in a few lines, the moments to foreground, any personalized details that matter, and the creative level (6.2) the job is being cut to.
- Celebrant and Signature jobs get a full brief — this is where the creative differentiation in 6.2 actually gets executed, not just promised
- Classic jobs can run on a lighter brief, but never zero — even the essential tier deserves to know whose wedding it's cutting
- The brief is written once, by the Post-Production Manager, and travels with the job — it shouldn't be re-explained verbally to every editor who touches it
6.5Project assignment logic
Projects should not be assigned simply based on who's free. That gets the footage edited, but it doesn't reliably get the right creative outcome for what the client paid for. Assignment should weigh five things together:
- Package level — Classic, Signature, or Celebrant (1.2)
- Creative requirement — what the brief (6.4) actually calls for on this specific job
- Editor skill — match the editor's demonstrated strength to the requirement, not just their track
- Availability — can they realistically take this on now
- Current workload — against the WIP cap (6.7), so one editor doesn't quietly become the bottleneck
In practice: Celebrant and high-difficulty Signature jobs default to Lead Editors or the Chief Editor / Creative Head; Classic and straightforward Signature jobs route to the wider Creative Editor pool. This is a judgment call for the Post-Production Manager to make at assignment time, not something to fully automate — but every assignment should be able to point to these five factors, not just "who was free."
6.6The 60-day stage budget
One clock, one owner per stage, starting the day After-Shoot Payment is marked complete — not the wedding date, the shoot date, or footage handoff. The countdown starts automatically at that trigger: it records the payment-completion date, calculates the expected delivery date, creates the milestones below, and moves the job into the assignment queue. See the companion Operations & Post-Production Department Design document for the full trigger logic and the notification schedule (30/15/7/3 days remaining, milestone-missed, deadline-missed).
| Days | Stage | Owner |
|---|---|---|
| 0–2 | Ingest, backup verification, catalog by event | Operations Manager / assistant |
| 3–7 | Culling & selection — narrow raw footage to the edit set | Assigned editors |
| 8–20 | Documentation edit — full-length cut of the event (the longest single task; starts as soon as culling is done) | Documentation Editors |
| 8–22 | Photo editing, retouching & album design | Photo Editors / Designer |
| 8–24 | Creative edit — wedding film, reel, teaser (+ colour grading on Celebrant/Signature) | Creative Editors / Colourist |
| 25 | Internal QC on the creative cut and documentation cut against the studio's quality standard (6.12) | Lead Editor / Chief Editor / QC |
| 26–30 | Revisions from QC | Assigned editor(s) |
| 31 | Preview gallery + film draft sent to client | Post-Production Manager / Customer care |
| 32–46 | Client selection window — capped at 15 days, reminders on day 7 and 12 | Customer care |
| 47–53 | Final album layout + final film cut with client selections | Assigned editor(s) / Designer |
| 54 | Final QC | Lead Editor / Chief Editor / QC |
| 55–59 | Export, upload to delivery system, album print file | Assigned editor(s) / PP Manager |
| 60 | Final delivery to client | Post-Production Manager / Customer care |
If a client goes past day 46 without selecting despite two reminders, the studio proceeds with its own curated selection to protect the delivery date — put this in the quote/contract up front (it already fits the existing "delivered within X days after photo selection" phrasing) so it's an agreed policy, not a surprise mid-project.
6.7Work-in-progress limits
At 60 days and ~35 weddings/month in peak season, roughly 70 jobs will be open in the pipeline at once — that's the natural consequence of the target, not a sign anything's wrong. Set this as an explicit WIP cap on the Project Management board (Section 5), and consider tracking it per track (photo / creative / documentation) since each track can back up independently. If the count of active jobs climbs meaningfully past the cap, that's the early-warning signal to add surge capacity (6.8) before the 60-day target starts slipping, rather than finding out from a client complaint.
6.8Peak-season staffing
- Treat Nov–Feb as needing a materially larger bench than the rest of the year — sizing this correctly, track by track, is what the Capacity Planner is for
- Build a vetted freelance editor pool ahead of season, ideally pre-tagged by track (photo / creative / documentation) since the skills aren't interchangeable — this mirrors the Crew Operations freelancer pool, 4.1
- Prefer temporary peak-season capacity over permanent headcount unless overall volume keeps growing — off-peak months don't need the same bench
6.9Backlog burn-down
The 60-day system above is the go-forward fix; it doesn't by itself clear jobs that are already overdue. Off-peak months (Mar–Oct) typically have spare editor capacity — use it deliberately to pay down the existing backlog rather than letting it quietly roll into the next Nov–Feb peak. The Capacity Planner's backlog section estimates a realistic clear-by date per track from your actual numbers; the target is zero backlog before the next peak season starts, not "whenever it happens to catch up."
6.10Daily & weekly control in Post-Production
The Post-Production Manager needs a clear daily view of the department, and management needs a weekly one. The Daily/Weekly/Project Tracker above is a working template for both — every card carries Current Stage, Responsible Person, Next Action, and Due Date, matching the standard set in 5.4.
| View | What it shows |
|---|---|
| Daily (Manager) | Projects needing action today · new projects entering the workflow · waiting for assignment · in editing · in QC · waiting for corrections · overdue tasks · approaching deadline |
| Weekly (management) | Projects completed this week · must close this week · at risk · critical · approaching the 60-day deadline · haven't progressed · pending work by department/editor |
This is what turns Post-Production from a reactive department — finding out about a problem when a client complains — into a controlled production system where nothing is missing an owner or a next step for more than a day.
6.11Pipeline
- Brief — Wedding Story Catalog turned into a Creative Brief by the Manager (6.4)
- Assignment — Package + Creative Requirement + Editor Skill + Availability + Workload (6.5)
- Production — first cut produced by the assigned editor(s)/Designer/Colourist
- QC — Lead Editor / Chief Editor / QC review against the studio's standard (see 6.12)
- Corrections — revision round(s) as needed
- Delivery — final QC pass, upload to the client delivery system, client review, project closure
6.12Delivery workflow & quality standard
Editors upload finished work to the shared Drive "File request" folder (already set up on kiranphotobooks@gmail.com) rather than sending files directly over WhatsApp. The delivery link is then shared to the studio's customer care WhatsApp number — keeping the internal production flow and the client-facing channel separate.
- Color grading consistency across a gallery/film — held to visibly different standards by creative level (6.2): Celebrant tightest, Classic essential
- Pacing and story structure for films — a large part of what the studio's award-winning work is recognized for — held to the tightest standard on Creative Editors' work, especially Celebrant
- Retouching consistency for photo galleries
- Documentation edits are checked mainly for completeness, sync, and export correctness rather than creative pacing — a lighter, faster QC pass than the creative track
- Document the standard (a short style guide with before/after examples per creative level) so it isn't solely dependent on one person's judgment
6.13Post-Production KPIs
- 60-day SLA adherence — % of weddings delivered within 60 days of after-shoot payment completion (the number that matters most right now), tracked overall, per editor track, and per creative level
- Active jobs in the pipeline vs. the ~70-job WIP cap (6.7)
- Average revision rounds per job, per track
- QC pass rate on first review, per track and per creative level — Celebrant should be watched separately, since a Celebrant job passing QC as easily as a Classic one is itself a signal the differentiation in 6.2 isn't showing up yet
- Backlog size (weddings past target), trending to zero
- Cards missing a Current Stage, Responsible Person, Next Action, or Due Date (6.10) — should be zero
Roles & Ownership
Each pillar needs one clear owner — this maps directly onto the roles currently being recruited (Operations Manager/Coordinator, Post-Production Manager, and Post-Production Editors across the photo, creative, and documentation tracks) plus the existing sales team.
| Pillar | Owner |
|---|---|
| Sales & Booking | Sales/Inquiry team lead |
| Promotion & Marketing | Marketing/PR owner — to confirm who |
| PR & Reputation | Marketing/PR owner |
| Crew Operations | Operations Manager (scheduling) + Crew Leads (on the day) |
| Project Management | Operations Manager/Coordinator |
| Post-Production — process & delivery | Post-Production Manager |
| Post-Production — photo editing & album design | Photo Editors + Designer |
| Post-Production — creative editing (film, reel, teaser) | Creative Editors + Colourist, QC'd by Lead Editors, signed off by the Chief Editor / Creative Head |
| Post-Production — documentation editing (full event) | Documentation Editors |
| Post-Production — quality control | Lead Editor / Chief Editor / QC (see note below) |
Post-production splits into distinct tracks and specialist roles with different skills and speeds (see 6.3) — treat their hiring, workload, and throughput separately rather than as one "editors" line.
A note on role names: the Creative & Post-Production Management System framework describes People as Coordinator / Editor / Designer / Colourist / Creative Head / QC. In this document, "Coordinator" is the Post-Production Manager role already in the current hiring packet — same position, kept consistent with the job post, interview guide, and offer letter already drafted for it. "Creative Head" is the studio's senior-most creative authority — the same function described elsewhere here as "Chief Editor"; use whichever title fits the org chart better once it's finalized. Designer, Colourist, and a standalone QC reviewer are specialist functions that can start folded into existing roles and be split into dedicated hires once Signature/Celebrant volume justifies it — see 6.3.
Promotion and PR don't yet have an owner distinct from the studio owner — as the system matures, this is the next role worth defining, even part-time or outsourced, since it's the one pillar with no dedicated hire in the current recruiting push.
Recommended Tool Stack
| Function | Tool | Status |
|---|---|---|
| Sales / CRM | Studio Ninja + in-house CRM | in use |
| Lead capture | Jotform | available |
| Content design | Canva | connected |
| Paid promotion | Meta Ads | connected |
| Crew scheduling | Google Calendar | connected |
| Project management | ClickUp (or monday.com) | recommended |
| File storage / delivery | Google Drive | connected |
| Post-production review | Frame.io | upgrade path |
Weekly Rhythm
| When | Meeting | Who |
|---|---|---|
| Monday | Ops review — walk the Project Management board, flag at-risk jobs | Operations Manager, Post-Production Manager, Owner |
| Daily (async) | Editor stand-up — what's in progress, what's blocked | Post-Production Manager + Editors, via the PM tool |
| Friday | Sales pipeline review + content/promotion planning | Sales lead, Marketing/PR owner, Owner |
| Monthly | Full KPI review across all six pillars | Owner + all pillar owners |
KPI Dashboard
What to review monthly, pillar by pillar.
| Pillar | Metrics |
|---|---|
| Sales | Inquiry volume by channel · response time · conversion rate · average booking value |
| Promotion | Reach/engagement by channel · cost per lead · inquiries per channel |
| PR | Awards submitted vs. won · press features · testimonial capture rate |
| Crew Ops | On-time arrival rate · equipment incidents · same-day backup completion |
| Project Management | On-time delivery rate · average cycle time · jobs flagged at-risk per week |
| Post-Production | Delivery SLA adherence · average revision rounds · first-pass QC rate |
90-Day Rollout Plan
Days 1–30
- Run the Capacity Planner with real editor-days-per-wedding to get an honest read on the gap; log the current backlog size
- Stand up the Project Management board with the after-shoot payment gate (5.1) and the ~70-job WIP cap (6.7); migrate all currently active weddings and the full backlog onto it
- Finalize Celebrant's deliverables and price (1.2) — everything downstream (creative levels, assignment logic, QC standard) references this tier, so it's worth settling early
- Connect Jotform to Studio Ninja for lead capture
- Onboard the Operations Manager/Coordinator as they're hired — this pillar is their first priority
Days 31–60
- Launch the 60-day stage budget and client-response cap (6.6) on every new job
- Start requiring the Wedding Story Catalog (4.5) and Creative Brief (6.4) on every job, and begin routing assignment by the Package + Creative Requirement + Editor Skill + Availability + Workload logic (6.5)
- Roll out the Daily/Weekly/Project Tracker (6.10) for the Post-Production Manager and management review
- Start the backlog burn-down using off-peak slack (6.9); bring on peak-season freelance capacity if the Planner shows a deficit
- Onboard the Post-Production Manager and additional editors as they're hired
- Document the quality standard/style guide (6.12), including what "visibly different by creative level" (6.2) actually looks like with before/after examples
Days 61–90
- Launch the content calendar and formal referral program (Section 2)
- Set up the awards submission calendar and assign a PR owner (Section 3)
- Run the first full monthly KPI review across all six pillars